-
Socket-shield surgery on two central incisors
Hürzeler, Markus B. -
3D planning and template-guided implant insertion in the partially edentulous jaw
Kirsch, Axel / Ackermann, Karl-Ludwig / Neuendorff, GerhardContents: - Planning and preparing a transfer stent - Introduction to on-screen 3D planning - CAD-designed transfer stent - Integrating the CAMLOG® Guide guiding sleeves - Fabricating a therapeutic restoration - Positioning the lab analogs on the master cast using the transfer stent - Titanium bridge frameworks for the temporary restoration - Surgical procedures: implant placement with the transfer template - Hydrocolloid impression taking and bite registration - Temporary insertion of the therapeutic provisional, demonstrating of a passive fit - Definitive CAMLOG abutments - Scanning the abutments, designing the crowns on-screen, machine driven milling of the zirconia crowns, veneering - Preparation for the delivery of the definitive restoration - Connecting the abutments, checking the torque, cementing the crowns, functional checks - Evaluating the completed restoration and assessing the teamwork of the dentist and dental technician -
3D planning and template-guided implant insertion in the edentulous jaw
Kirsch, Axel / Ackermann, Karl-Ludwig / Neuendorff, GerhardContents: - Surgical procedures for anchoring a diagnostic guide - Inserting four provisional implants - Impression and bite registration, fabrication of the master cast - Tooth-setup for the temporary restoration - Registering the setup in a silicone index - Duplicating the setup in radiopaque resin for CT imaging - Implant planning using a 3D record of the CT image - Fabricating a transfer template based on the CAD treatment plan using the CAMLOG® Guide System - Inserting the guiding sleeves into the template - Fabricating the final restoration prior to inserting the implants - Vario SR abutments with Vario SR titanium copings for a passive fit - Fabricating a cast titanium framework to reinforce the restoration - Surgical procedures demonstrating the definitive implant insertion - Insertion of six implants for immediate loading - Providing a controlled-clearance fit between the implants and the denture base -
-
-
12 weeks after a sandwich osteotomy in the posterior mandible: implant insertion
Bormann, Kai-Hendrik -
Cocoon-technique containment and contouring
Gellrich, Nils-Claudius -
Computer-guided implant insertion at site 25
Hürzeler, Markus B. -
-
Immediate placement and all-ceramic restoration in the anterior maxilla - a customized interdisciplinary treatment approach
Happe, Arndt / Nolte, AndreasContents: - Patient presentation and esthetic analysis - Careful extraction of a non-salvageable tooth - Miniplast splint as a surgical template - Harvesting bone from the implant bed - Placing a CONELOG® implant at site 11 - Obtaining a corticospongeous bone cylinder at site 48 - Alveolar augmentation and reconstruction of the buccal bone lamella - Harvesting a connective-tissue graft - Tunneling the vestibular mucosa, various suturing techniques - Insertion of the provisional restorations - 3 months later: Preparing, impression and arbitrary transfer with a bite fork and facebow, temporary restoration - Master cast, new wax-up, determine the emergence profile - Fabricating a hybrid abutment, Scanning the custom abutment, on-screen crown design - Fabricating a zirconia abutment and a feldspathic ceramic veneer - Conditioning and adhesive attachment of the components, final intraoral check - Try in and adhesive cementation