-
Periodontal regeneration at teeth 21 and 23 using EMD and cortical bone chips
Topoll, Heinz H.Contents: - Incisions using a microsurgical scalpel - Reflecting a buccal flap - Preparing papillary flaps using a microsurgical scalpel - Lifting off of the papillary flaps using a papillary elevator - Removing the granulation tissue using an ultrasound scaler - Cleaning the dental roots using manual instruments - Trying to dental root - Applying Emdogain - Mixing Bio-Oss and Emdogain - Introducing the Bio-Oss into both bone defects - Microsurgical suturing Materials Checklist: Cheek retractor Microsurgical scalpel blade holder Microsurgical scalpel blade Soniflex tips Bone rest Castroviejo microsurgical needle holder Suturing scissors Dental tweezers Microsurgical tweezers Monofilament suturing material 6/0 Seralene Pref gel Emdogain Bio-Oss -
Immediate placement and all-ceramic restoration in the anterior maxilla - a customized interdisciplinary treatment approach
Happe, Arndt / Nolte, AndreasContents: - Patient presentation and esthetic analysis - Careful extraction of a non-salvageable tooth - Miniplast splint as a surgical template - Harvesting bone from the implant bed - Placing a CONELOG® implant at site 11 - Obtaining a corticospongeous bone cylinder at site 48 - Alveolar augmentation and reconstruction of the buccal bone lamella - Harvesting a connective-tissue graft - Tunneling the vestibular mucosa, various suturing techniques - Insertion of the provisional restorations - 3 months later: Preparing, impression and arbitrary transfer with a bite fork and facebow, temporary restoration - Master cast, new wax-up, determine the emergence profile - Fabricating a hybrid abutment, Scanning the custom abutment, on-screen crown design - Fabricating a zirconia abutment and a feldspathic ceramic veneer - Conditioning and adhesive attachment of the components, final intraoral check - Try in and adhesive cementation -
3D planning and template-guided implant insertion in the partially edentulous jaw
Kirsch, Axel / Ackermann, Karl-Ludwig / Neuendorff, GerhardContents: - Planning and preparing a transfer stent - Introduction to on-screen 3D planning - CAD-designed transfer stent - Integrating the CAMLOG® Guide guiding sleeves - Fabricating a therapeutic restoration - Positioning the lab analogs on the master cast using the transfer stent - Titanium bridge frameworks for the temporary restoration - Surgical procedures: implant placement with the transfer template - Hydrocolloid impression taking and bite registration - Temporary insertion of the therapeutic provisional, demonstrating of a passive fit - Definitive CAMLOG abutments - Scanning the abutments, designing the crowns on-screen, machine driven milling of the zirconia crowns, veneering - Preparation for the delivery of the definitive restoration - Connecting the abutments, checking the torque, cementing the crowns, functional checks - Evaluating the completed restoration and assessing the teamwork of the dentist and dental technician -
3D planning and template-guided implant insertion in the edentulous jaw
Kirsch, Axel / Ackermann, Karl-Ludwig / Neuendorff, GerhardContents: - Surgical procedures for anchoring a diagnostic guide - Inserting four provisional implants - Impression and bite registration, fabrication of the master cast - Tooth-setup for the temporary restoration - Registering the setup in a silicone index - Duplicating the setup in radiopaque resin for CT imaging - Implant planning using a 3D record of the CT image - Fabricating a transfer template based on the CAD treatment plan using the CAMLOG® Guide System - Inserting the guiding sleeves into the template - Fabricating the final restoration prior to inserting the implants - Vario SR abutments with Vario SR titanium copings for a passive fit - Fabricating a cast titanium framework to reinforce the restoration - Surgical procedures demonstrating the definitive implant insertion - Insertion of six implants for immediate loading - Providing a controlled-clearance fit between the implants and the denture base -
Treatment of the Edentulous Mandible with an Immediately Loaded Screw-retained Fixed Restoration - The entire case
Yüksel, OrcanProcedure: - Presentation of procedure for immediate implant loading in the edentulous mandible according to the Ledermann concept - Surgical implantation of XIVE® TG implants - Bite registration and impression-taking - Presentation of prosthetic components - Fitting and passive fixation of the mesostructure in the mouth - Integration procedure Contents: This video demonstrates the extraction of teeth in a partially dentate mandible followed by immediate loading of six XIVE® TG implants. Following the Ledermann immediate loading concept, a mesostructure will be used for tension-free primary interlock in this special case. Bridge-like lower full dentures with plastic teeth will then be inserted on this frame and retained with an occlusal screw. Since the dentures can only be removed by the dentist, they are \fixed\ as far as the patient is concerned. This simple and quickly produced yet extremely well-fitting restoration, which requires only minimal time and effort for the implant components, is the subject of this contribution. -
Piezo Surgery Technique for Alveolar Ridge Augmentation with Sinus Lift
Schlee, MarkusOverview: - Periodontal and implant planning - Treatment of a horizontal and vertical bone defect - discussion of the literature - Clinical implementation of bone augmentation using a bone block and treatment of a vertical pocket with Emdogain - Sinus lift in combination with alveolar ridge augmentation and horizontal expansion of the alveolar process; orthodontic straightening of a molar tooth Contents: This contribution illustrates a complex periodontal-implantological case, from treatment planning to clinical implementation. It details the transplantation of two bone blocks from the linea obliqua of the angle of the jaw to the anterior front tooth region, the treatment of a vertical bone pocket with Emdogain, the straightening of a molar tooth using orthodontic mini-implants, and a sinus lift together with alveolar ridge augmentation in the maxillary region using a piezo surgical technique. -
Guided Bone Regeneration in Posterior Maxilla with Membrane Technique. Insertion of an Implant - The entire case
Mengel, Reiner / Foitzik, ChristianOverview: Part 1 - Incision and mobilization of the mucoperiosteal flap - Cleaning the bony defect - Screw insertion for support, membrane application and fixation - Suture closure Part 2 - Opening of the mucosa above the region of augmented bone - Preparation of tunnel and bone bed for an open screw-type endosteal implant (Straumann® implant) - Use of single button sutures for tension-free wound closure Contents: This female patient presented with bone loss due to a radicular cyst at tooth 27 and peri-implantitis at tooth 26. Four months after extraction of the respective tooth and implant, guided bone regeneration (GBR) was carried out using supporting screws and an e-PTFE membrane for augmentation of the posterior tooth region of the maxilla. Four months after GBR the insertion of an implant took place. -
Multiple recession coverage using a modified tunnelling procedure
Zuhr, OttoOverview - Incision technique - Flap creation - Transplant fixation - Suture closure Contents: This video demonstrates the coverage of multiple recessions by means of a modified tunneling technique characterized by the use of a minimally invasive, atraumatic procedure without the creation of vertical incisions -
Combined implant treatment with soft and hard tissue management
Schlee, MarkusProcedure - Soft and hard tissue management - Implantodontic treatment - Case documentation Contents: - History - Patient hadn't seen a dentist for 15 years - Has been on Marcumar since developing a blood clot in 1997 - His general practitioner extracted teeth and performed conservative dentistry during the last year - Heavy smoker (30 cigarettes a day) - Prothrombin time (Quick's value): 40 - Premedication: Augmentan 750/125 tablets. -
Bone Transfer
Streckbein, RolandContent: Description of system and instruments. The patient had a considerable bone deficit at tooth 21. Augmentation was therefore required and was carried out using calibrated instruments. The augmentation site was prepared using instruments that matched the tools used to harvest the cylindrical bone graft at the donor site. This perfect match between the augmentation region and the bone transplant accelerated osseointegration, there by shortening the required waiting time for implant placement. -
Implant-borne Immediate Prothesis on Laser-Welded Bar
Drobig, FelixDescription of baseline situation; Exposure of underlying bone; Insertion of four implants; Impression-taking; Bar construction; Welding the individual components, Correction of tension; Finishing the bar; Adjusting the prosthesis; Implant placement. -
Esthetic Periodontal Treatment with Microsurgical
Wachtel, HannesContents - Instruments and planning - Incision - Split thickness flap preparation - Harvesting connective tissue for grafting - Palatal sutures - Transplant insertion and suture - Microsurgical suture Synopsis: Microsurgical operation to repair two adjacent, exposed root surfaces. The video demonstrates step-by-step how to prepare a coronally advanced split-thickness flap with subepithelial connective tissue. To remove connective tissue from the palate, a horizontal incision is required. Ultra-precise microsurgical suturing is the key to obtaining aesthetically perfect results.





